Re: Conn 4th valve


[ Follow Ups ] [ Post Followup ] [ TubeNet BBS ] [ FAQ ]

Posted by Joe S. on July 01, 2000 at 23:36:24:

In Reply to: Conn 4th valve posted by Ray DCamp on June 29, 2000 at 13:03:43:

A talented repairman and plenty-o-dough could make possible the splicing of a 14K/36K #2 casing on to the end of your #3 casing. Some adaption is needed (particularly in the two knuckles which serve the added tubing loop), but the connecting ports and escape port on the 14K/36K #2 casing line up just like you need them to, and there is the potential of a "factory" appearance.


Follow Ups: